STH 25 Reconditioning

STH 25 Reconditioning
Transportation | Roadway Design

CORRE completed design work for a nearly 6.5-mile-long roadway resurfacing and realignment project in Dunn County. This project included utility relocations, cultural resource investigations, and realignment of a horizontal curve to improve roadway safety. A companion HSIP project was included in this contract to widen the paved shoulders and place rumble strips. Public outreach was completed with adjacent landowners regarding the proposed improvements and anticipated land impacts. This contract also included supplemental survey, preliminary and final roadway design, and a TPP.

Key Elements/Deliverables
  • Construction staging plans
  • Design Study Report (DSR)
  • Environmental documentation
  • Final PS&E
  • Preliminary and final roadway plans
  • Section 106
  • Survey
  • Transportation Project Plat (TPP)

Location: Dunn County, WI
Client: WisDOT NW Region
Construction Cost: $3.6M
Client Type: State Agency