I-43 Bridge Rehabilitations
Transportation | Structure Design
CORRE prepared rehabilitation plans for three structures as part of the I-43 project from Howard Avenue to the Valley Bridge. This project was on an expedited schedule to ensure construction was completed before construction began on the Zoo Interchange. CORRE inspected each structure to determine repair items/limits and provided load ratings. Staged construction maintained traffic on the mainline structures. Close coordination with the project team was maintained to ensure consistency between plans and ensure the project schedule was met.
Key Elements/Deliverables
- Expedited design schedule
- Load ratings
- Preliminary and final structure design
- Staged construction
- Structure related PS&E documents
- Structure survey reports
Location: Milwaukee County, WI
Client: WisDOT SE Region
Construction Cost: $57M
Client Type: State Agency