STH 58 Rehabilitation
Transportation | Roadway Design
CORRE completed design work for this pavement replacement project north of Mauston in Juneau County. The scope included pre-milling the existing pavement, utilizing a cold-in-place recycle treatment of the remaining asphalt, and then overlaying the existing roadway. Design included evaluation of the existing beam guard to verify length of need was met and a field review of cross culverts to provide recommendations for replacement. Public involvement was a key factor with this project due to adjacent business concerns. Ninety percent PS&E documents were submitted six months early for this project which was completed in August of 2020.
Key Elements/Deliverables
- Beam guard design
- Design Study Report (DSR)
- Environmental documentation
- Final PS&E
- Preliminary and final roadway plans
- Public involvement
- Roadway resurfacing design
Location: Juneau County, WI
Client: WisDOT SW Region
Construction Cost: $5M
Client Type: State Agency