STH 13, Cities of Colby and Abbotsford

STH 13, Cities of Colby and Abbotsford
Transportation | Construction Services

CORRE provided construction oversight and inspection services for this multi-stage project on STH 13 in Marathon County which consisted of replacing 90 non-ADA compliant pedestrian ramps with new ADA compliant ramps. The project also consisted of an urban two-inch HMA PWL mill and overlay operation done in multiple stages to fix the existing profile and cross slopes.

default

The project team solved issues arising during pedestrian ramp replacements and provided extensive coordination with the City of Colby’s watermain replacement project which took place within the project limits. CORRE coordinated project scheduling meetings with both cities and the contractors to ensure all projects would be completed on time.

Since the project occurred during local street festivals and over two major holidays, CORRE entered LCS lane closures and sent out weekly updates to the public/stakeholders to keep the traveling public safe and informed. CORRE also maintained a safe site for the traveling public by proactively adding and modifying the traffic control devices to fit the needs of each stage.

The project included staged construction, concrete sidewalk, concrete curb and gutter, pedestrian curb ramp replacement, asphaltic surface milling, PWL HMA pavement, HMA pavement longitudinal joints, pavement markings, and permanent signing.

Location
Marathon County

Client
WisDOT NC Region

Construction Cost
$3.5 Million

Fast Facts

  • 90 curb ramps replaced for ADA compliance
  • Multi-stage mill and overlay
  • Coordination with city watermain project