CTH X Reconditioning, 197th Street to CTH XX
Transportation | Roadway Design
CORRE completed the design of this three-mile rural reconditioning project. During preliminary design, several pavement treatments were considered and a pre-mill with cold-in-place recycle treatment of the remaining asphaltic material was chosen. During construction, when different existing pavement conditions were encountered CORRE worked with both Chippewa County and WisDOT to evaluate and revise recommendations.
In addition to pavement improvements, the initial design includes shoulder widening, ditching, culvert sizing, and intersection improvements at CTH X and CTH XX. CORRE completed an intersection evaluation to determine if geometric issues may have contributed to past accidents in the area. The evaluation prompted geometric changes including the addition of a curb and gutter to better delineate the roadway from the parking lot and removing parking stalls adjacent to an establishment at the intersection.
Due to the proposed earthwork and widening, a right of way plat was completed. In addition to survey and plat preparation, CORRE also completed real estate acquisition for the corridor.
Key Elements/Deliverables
- Topographic survey
- Section 106 (archaeology)
- Safety certification review
- Utility coordination
- Public involvement
- Intersection safety evaluation
- Culvert sizing
- Preliminary and final roadway design
- Pavement design
- Right of way plat
Location: Chippewa County, WI
Client: Chippewa County Hwy Dept