CTH E Multi-Use Path

CTH E Multi-Use Path
Transportation | Non-Traditional/Multi-Use Path Design

This 0.75-mile trail was built within County right of way along CTH E adjacent to property owner’s front yards. In addition to the standard 10-foot-wide asphalt trail, the trail incorporates two new walls to extend the roadway plateau over tributaries, coordination with the railroad for a new at-grade crossing along CTH E, connection with existing County trail on the west side, and future planning for tie-in with on-road facilities.

Key Elements/Deliverables
  • Boardwalk/structure design
  • Endangered species coordination
  • HazMAT investigation
  • Hydrology and hydraulics
  • Interagency coordination
  • Public outreach
  • Right of way plat
  • Signalization/intersection improvements
  • State and local permitting
  • Trail design
  • Wetland delineation

Location: Kenosha County, WI
Client: Kenosha County, WI
Construction Cost: $325K
Client Type: State & Local Government